line-style

SAP Production planning training content

  1. Overview of ERP

About SAP

SAP Hierarchy Structure

Organization structure

  1. Master Data

Material master configuration and use in production planning

Bill of material (BOM) configuration and use in production planning

Routings configuration and use in production planning

Work center configuration and use in production planning

  1. Demand planning process

Sales and Operations Planning

Demand Management planning strategies and planned independent requirements

Long-Term Planning

  1. Sales and Operational Planning – SOP

Standard Planning

Planning with the Product Groups

Planning with the Materials

Product Group Aggregation and Desegregation

Creation of Plan and version management

Transfer of Plan to Demand Management

  1. Requirement planning (Material)

Master Production Scheduling procedure (MPS)

Consumption based planning (CBP, re-order point planning, forecast-based & Time-phased)

Material requirement planning (MRP) run configuration

Material requirement planning evaluation tools

  1. Batch Management

Access Sequence

Strategy Types

PP Batch Search Procedure

Batch Status in PP

Characteristics and class

SLED In Batch in PP

Manual And Automatic Batch Display In PP

Production orders creation using Batch

  1. Variant Configuration in PP

Variant Configuration in BOM

Characteristics

Class

Classification

Classification settings in material master

Maintain Dependency

Configurable Profile for Material

  1. Availability Check

Availability Check with ATP Logic or Against Planning

  1. Capacity Planning

Capacity planning master data components

Capacity planning scheduling parameters

Available capacity determination

Capacity evaluation

  1. Product costing

Material cost estimate based on quantity structure

Material cost estimate with out quantity structure

Cost run

Variance

  1. Production Orders 

Scheduling of production orders

Production order components

Production Resources & Tools (PRT’s)

  1. Discrete Manufacturing

Planned order structure

Production order types

Material staging and withdraw

Production confirmation

Goods movements

  • Goods Receipt WREF to Production Order
  • Goods Issue WREF to Production Order
  • Creation of GI WREF to Reservation
  • Restricting Goods Receipt Unless Production Order is Confirmed

Order settlement

  1. Repetitive Manufacturing

Master Data

Product cost collector

Planning

Planning Table

Pull List material staging

Back flushing

REM Backflushing

  1. Process manufacturing

Master data

Process order

Process management

  1. Configuration

Overview of configuration

  1. Reporting & Tools

Material requirement planning reporting

Maintenance of master data using mass change function

  1. INTEGRATION OF PP WITH OTHER MODULES

MM

SD

QM

WM

FI /CO

  1. Introduction to SAP S4 HANA 1909 & discussion on simplification list.

Introduction to S4 HANA

Simplification list

Leave a comment